Find Advertising Trash Can, Trash Can Mould, Household Product on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Home > Products > Commodity Mould > Garbage Bin Mould > New Style Chinese Manufacturer Plastic Trash Can

New Style Chinese Manufacturer Plastic Trash Can

Basic Info

Model No.: Plastic Mold

Product Description

Product Description

JMT MOULD Description:

JMT MOULD Speicification:

Mould Material NAK80,S136,2316,2738,H13,5CrNiMo,718H,P20,40Cr,60#,45# etc
Product Material PP,PE,PC,PA,PS,PU,PVC,PMMA,ABS etc
Cavity No. Single or multi
System Of Runner Hot runner,Cold runner,Pin-point gate,Submarine gate, etc
Ejector Type Ejector pin,Air gate,Ejector plate,Hydro-cylinder,etc
Term Of Mould Production 35days- 60days
Guaranteed Number Of Cycles 500,000-1,000,000 
Mould Design Software Ug,Proe,Solidworks AotoCAD,Moldflow,ect

JMT MOULD Process

1 Product Design

Customer sends us the product drawing directly or we draw the product

according to the sample,then we send customer the product drawing to confirm

2 Mould Design

We'll start to design mould after the product drawing confirmed,then

send customer the mould drawing to confirm

3 Mould Making

The mould will be made after the mould drawing being confirmed,the process

 include steel material preparing,CNC, EDM, WEDM,polishing, accembling,etc

4 Mould Test

Mould will be tested after mould assembly,then we'll send customer samples

 and video of mould testing to confirm

5 Final Process

The mould start to polish if the sample is ok,and make grain,nitridation or

 chroming if customer required

6 Mould Test

We'll test the mould again after polishing,then send customer the final

sample and video of mould test to confirm

7 Mould Packing

The mould will be packed with wooden case after the final sample confirmed

 

Company Information

 

 

 
Packaging & Shipping

 
Our Services

JMT Mould Quality Control

1.Mould Material Q/C

a) Mould Steel checking (hardness,flaw detection)

b) mould spare parts checking (hardness,size 

2.Mould Making Process Q/C

a) design checking ( part design,mould desig,mould enginering drawing)

b) mould size checking (according to drawing)

c) mould testing (check mould working,sample) 

Attention pls:

 Pease offer the following information when you send us the mould inquiry

a) product drawing or the sample photo with sizes.

b) mould steel you want to use.

c) standard mould base or not.

d) runner system you want(cold or hot)  

FAQ

Q:what is your trade term?

A:usually FOB ningbo

 

Q:what is your payment term?

A:50% down payment against order confirmation,50% balance payment prior shipment.

 

Q:what is your delivery time?

A: usually 40~90days,depends on your projects.

 

 

 

 

Should you have any Plastic Mould projects,

Welcome to send us the 2D/3D files and specification,

We will quote our best terms for you ASAP!

And we are ready to offer you best service at any time!

Contact us if you need more details on Advertising Trash Can. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Trash Can MouldHousehold Product. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Commodity Mould > Garbage Bin Mould