plastic modern dustbin molding
Basic Info
Model No.: JMT bucket MOULD
Product Description
Specifications
Garbage Bin Mould1.Mould base:LKM, HASCO
2.Cavity:Single/muti
3.Runner:cold /hot
4.Design software:UG, PROE
Environmental protection is a practice of protecting the natural environment on individual, organizational or governmental levels, for the benefit of both the natural environment and humans.
We make garbage bin mould ,we hope our product can make a contribution to protect
the environment,to make our life more beautiful .
Let's keep our earth clean!
Below is the specification of our garbage bin mould,if you have any question pls contact with me .Thanks!
Name | Plastic trash can /dust bin mould |
Runner | Cold runner. Hot runner: Yudo/DME/HASCO |
Machine | 80-1600T |
Standard | HASCO, DME, LKM |
Specification drawings | Pro/E, Auto CAD, Solidwork, CAXA UG, CAD/CAM/CAE. |
Precision machining | CNC, milling machine, drilling machine, numerical lathe, all types of lathe |
Surface finish process | polishing, sand blasting, heat treatment, painting, powder coating, anodizing, electroplating, mirror polish |
Shaping mould | injection mould |
Mould life | above 500000-1000000 shots and up |
Service | OEM service available, good after-sales service . |
Lead time | 4-7 weeks, 40 days or according to the real situation . |
Mould material | P20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc . |
JMT - Mould Trade Process :
1.Quote | According to sample, drawing and specific requirement. |
↓ | |
2.Discussion | Mold material, cavity number, price, runner, payment, etc. |
↓ | |
3.S/C Signature | Approval for all the items |
↓ | |
4. Advance | Pay 50% by T/T |
↓ | |
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report |
↓
| |
6.Mold Tooling | We start to make mold after mold design confirmed |
↓ | |
7.Mold Processing | Send report to customer once each week |
↓ | |
8.Mold Testing | Send trial samples and try-out report to customer for confirmation. |
↓ | |
9. Mold Modification | According to customer's feedback |
↓ |
|
10.Balance settlement | 50% by T/T after the customer approved the trial sample and mould quality. |
↓ |
|
11.Delivery | Delivery by sea or air. The forwarder can be designated by your side. |
Q:what is your trade term?
A:usually FOB ningbo
Q:what is your payment term?
A:50% down payment against order confirmation,50% balance payment prior shipment.
Q:what is your delivery time?
A: usually 40~90days,depends on your projects.
Should you have any Plastic Mould projects,
Welcome to send us the 2D/3D files and specification,
We will quote our best terms for you ASAP!
And we are ready to offer you best service at any time!
Product Categories : Commodity Mould > Garbage Bin Mould